Tower Foundation of the 40mm Lattice Tower in Kavach, Southern Eastern Railway

Tower Foundation of the 40mm Lattice Tower in Kavach, Southern Eastern Railway

Railway Kavach Tower Foundation Project for 40 mm Lattice Towers

Stallion Power Infra Private Limited successfully executed the Survey, Foundation Construction and Allied Civil Works for 40 mm Lattice Towers associated with the Railway Kavach Automatic Train Protection (ATP) System. The project involved the construction of robust and accurately aligned tower foundations to provide a stable structural base for the installation of Kavach equipment and associated railway signalling infrastructure.

The foundation works included detailed site survey and setting out, excavation, reinforcement, shuttering, concreting, curing, foundation bolt installation, backfilling and finishing activities. Special attention was given to maintaining the required foundation dimensions, reinforcement arrangement, tower alignment and embedded component positioning in accordance with approved drawings and railway specifications.

The project was executed with a strong focus on structural stability, construction quality, safety and precision. The completed foundations provide a durable and reliable base for the subsequent erection of Kavach lattice towers and installation of associated signalling and communication equipment, contributing to the development of safer and more reliable railway operations.

Project Scope

  • Detailed site survey, setting out and marking of Kavach tower foundation locations.
  • Site preparation and excavation for 40 mm Lattice Tower foundations.
  • Foundation layout and dimensional verification as per approved drawings.
  • Reinforcement cutting, bending, fabrication and placement.
  • Shuttering and formwork for RCC foundation construction.
  • Supply, placement and compaction of concrete for tower foundations.
  • Installation and accurate positioning of foundation bolts and embedded components.
  • Concrete curing and quality control at different stages of construction.
  • Backfilling and proper compaction around completed foundations.
  • Final finishing, cleaning and preparation of foundations for tower erection.
  • Inspection and rectification of foundation works as per Railway Engineer's instructions.
  • Site restoration and removal of construction debris after completion.

Key Highlights

  • Project: Railway Kavach Tower Foundation
  • Tower Type: 40 mm Lattice Tower
  • Application: Kavach Automatic Train Protection (ATP) System
  • Work Category: Railway Signalling & Safety Infrastructure
  • Major Works: Survey, Excavation, RCC Foundation, Reinforcement, Shuttering & Concreting
  • Foundation Works: Foundation Bolts, Curing, Backfilling & Finishing
  • Execution: Construction and preparation of tower foundations for Kavach installations
  • Quality: Executed as per approved drawings, railway specifications and quality requirements.
  • Safety: Strict adherence to railway safety and construction HSE practices.
  • Precision: Accurate alignment, dimensions and foundation bolt positioning maintained throughout execution.

Project Highlights

  • Construction of RCC foundations for 40 mm Lattice Towers used in the Railway Kavach system.
  • Accurate setting out and alignment of tower foundation locations.
  • High-quality reinforcement and concrete work for long-term structural stability.
  • Precision installation and positioning of foundation bolts.
  • Proper curing, backfilling and compaction of completed foundations.
  • Foundation construction prepared for efficient and safe tower erection.
  • Execution coordinated with railway site requirements and engineering instructions.
  • Comprehensive inspection and quality control throughout the construction process.
  • Strict compliance with safety procedures applicable to railway infrastructure works.
  • Delivered by experienced civil engineering and project execution teams.
Project Details
  • Status Completed
  • Client Skipper Limited
  • Location Chakradharpur Division, Jharkhand
  • Start Date Dec 01, 2024
  • End Date Sep 15, 2025
Interested in Our Work?

Contact us to discuss your project requirements.

Contact Us